
Builders cleans and post construction cleaning in Perth
Handover-ready builders cleans for Perth commercial fit-outs, refurbishments and new builds — dust and debris removed, fixtures detailed, and the site left ready for the client walk through.
What post construction cleaning includes
- Dust and debris removal from all surfaces
- Window, glass and mirror cleaning
- Fixture and fitting detail cleaning
- Floor scrubbing and protection removal
- Kitchen and amenities sanitisation
- Final handover presentation
How the clean is staged
Every programme is written into a schedule you sign off before work begins — and adjusted in writing, never silently.
- Rough cleanAfter trades finishBulk debris, plaster dust and protection removal from floors and surfaces.
- Detail cleanBefore handoverFixtures, glass, skirtings, wet areas and high dusting.
- Final touch-upHandover daySpot marks, fingerprints and presentation-ready finish.
Frequencies indicative — confirmed at the walk through
How a post-construction clean runs
Three stages from locked-up site to handover-ready space.
- 01
Site walk and scope
We walk the site with you or the site manager, note the trades completed, surfaces installed and any hazards, then write the scope by area.
- 02
Rough clean
Bulk debris, plaster dust and surface protection are removed so detail work can happen safely and thoroughly.
- 03
Detail clean
Fixtures, glass, kitchens, amenities and floors are cleaned to handover standard — dust chased from ledges, vents and cavities.
- 04
Final touch-up
A last walk removes fingerprints, spots and smudges before the client or certifier inspects.
What moves a post-construction cleaning price
Builders cleans start from $7 per square metre or $85 per labour hour, depending on scope. Two fit-outs of the same size can price very differently, so the final quote is itemised in writing.
Every quote itemised in writing — Incl. GST · indicative until confirmed
- 01Size and layoutSquare metres set the baseline; open plan is faster than partitioned offices with many corners.
- 02Trades completedPlaster, paint, flooring and joinery each leave different residue — the scope is written around what is actually there.
- 03Window and glass areaLarge glass façades and partitions add significant time and are priced as their own line.
- 04Floor type and protectionCarpet, vinyl, polished concrete and tile each need a different approach; protection removal can be labour-intensive.
- 05Handover deadlineTight practical-completion dates may need larger crews or out-of-hours work.
Why it pays
The final clean is the last thing before handover — and the first thing the client sees.
- 01Handover on the dateRough clean, detail clean and final touch-up are scheduled against practical completion, with out-of-hours crews when the date is tight.
- 02Fewer defect itemsDust, residue and paint specks removed properly means fewer cosmetic items landing on the defect list.
- 03Protected new finishesGlass, stone and new floor coatings are cleaned to the finish, not scoured with whatever is on the truck.
- 04One trade to coordinateA single scope covering the whole tenancy instead of chasing each trade for its own mess.
Common questions about post construction cleaning in Perth
The questions Perth managers and coordinators ask before engaging a post construction cleaning provider.
The detailed clean that happens after builders, painters and floor layers have finished — removing dust, debris and residue so the space is ready for handover or occupation.
Industries we clean for
Book a free site walk through
Tell us about the site and we will call to arrange the walk through. The scope and the price are put in writing before anything starts.
- 01Send the form — or call 08 6187 5531.
- 02We call you back to arrange a walk through at a time that suits.
- 03You receive a written scope and an itemised quote, incl. GST — no obligation.
- $20M public liability
- 100% police-checked team
- Written quote — no obligation
